Sharqia Governor Oversees Winter Drainage Test at Orabi Tunnel
Automated summary•3 October 2026 at 10:56

Sharqia Governor Hazem El-Ashmouni observed a practical test of the rainwater drainage system at Orabi Tunnel in Zagazig as part of preparations for winter.
The trial focused on testing the system’s ability to drain rainwater from the tunnel ahead of the rainy season.
El-Ashmouni attended the exercise in person to follow the checks on the tunnel’s drainage arrangements.
The available details did not specify the outcome of the test or whether any further work would be needed.
This is an automated summary from the available headline and excerpt, not the full story or a claim of human review.
Latest Governorates — refreshed every 30 minutes
News refreshes automatically every 30 minutes. Every headline opens inside Trend Masr.
